Published On May 16, 2023
Part 1 was the complete demo and laying out a plan.
Part 2 is completing the plumbing, waterproofing, and getting ready to tile.
Also, I needed to cut out a section of floor joist which was massacred during an earlier renovation and find a solid solution for supporting the shower.
The plumbing of the Grohe smart box and all the shower fixtures begins.
Grohe Smartbox Model 35601000
https://www.grohe.ca/Diverter-Valves-...
Grohe F-series Rainshower showerhead Model 27254000
https://www.grohe.ca/Shower-Heads/5-I...
Music from #InAudio: https://inaudio.org/
Track Name - Urban Harmony.
Music from #InAudio: https://inaudio.org/
Track Name - Returning Home.
show more