Studio Remod pt. 1 - Tear out, Framing, Electrical, Plumbing, Insulation
Rainfall Projects Rainfall Projects
244K subscribers
81,350 views
4.4K

 Published On Jun 30, 2020

Click here https://www.kiwico.com/RainfallProjects or use code RAINFALL for 20% off everything on site! Both subscriptions and everything in store! Offer valid through August 31st.

The old building we have behind our house, which we call the rec room, isn't good for much other than storage. Over the years it has filled up with junk and it's a dark, damp space. Kelly been wanting an art studio and we both decided that with some work the rec room could be the perfect space. We also thought that if we put in a small bathroom and kitchen area that it would be a perfect guest house for when the in-laws are visiting from Ireland. Job number one was to get the space emptied, which was no small feat. Next we started pulling down the interior walls and gutted most of what was there. We decided on this project to get some help, since it's summer time here on the farm and I'll be busy planting and doing other things on the farm often. Robert is a long time family friend that has helped us with many projects here on the farm over the years and I've learned a lot watching him work. Robert and I framed in the new changes to the layout of the building and then started cutting out the siding for new windows and doors. With the windows set, we ran the electrical and plumbing and lastly hung some insulation just in time for a load of drywall to show up.

show more

Share/Embed