3D animation about the main tamping phases
Plasser & Theurer - Export von Bahnbaumaschinen Gesellschaft m.b.H. Plasser & Theurer - Export von Bahnbaumaschinen Gesellschaft m.b.H.
4.92K subscribers
3,819 views
76

 Published On Oct 6, 2023

How to correct track geometry faults in longitudinal level and alignment

Plasser & Theurer developed a mechanised technique for this purpose: the system of non-synchronous constant pressure tamping which in professional circles is regarded as pioneering and unequalled in quality. The tamping tines penetrate the ballast bed from above and compact the ballast under the sleeper with a squeezing movement. Two factors are decisive here. Firstly, all tamping tines work with the same pressure; and secondly, the tamping tines vibrate with the ideal frequency of exactly 35 Hz. This directional, linear vibration combined with the non-synchronous tine movement produces a homogeneously compacted ballast bed.

Visit the website of Plasser & Theurer: https://www.plassertheurer.com/en

Follow us on Instagram: https://www.plassertheurer.com/instagram

Like us on Facebook: https://www.plassertheurer.com/facebook

Join the P&T Railclub: https://www.pt-railclub.com/en

#plassertheurer #plasser #railwork #railworker #railclub #innovationforyou #yellowmachines #futuretracktechnologyNOW

show more

Share/Embed