New Zuari Bridge (Monohar Setu)| 2nd longest and widest Cable -Stay Bridge in India | GOA , INDIA
Civil Positive Civil Positive
9.52K subscribers
599 views
10

 Published On Dec 3, 2022

New Zuari Bridge (Monohar Setu)| 2nd longest and widest Cable -Stay Bridge in India | GOA , INDIA

#civilpositive
#cablestayedbridge
#goaindia

#signature
#bridgeconstruction
#bridgecourse
#cable
#highwayride
#highwayconstruction
#bridgeconstruction
#Highwaycumbridge

The New Zuari Bridge (Manohar Setu)
Edit
This is an under-construction cable-stayed bridge over Zuari River on the Panaji-Margao National Highway (NH-17/ NH 66). It is now being built by Dilip Buildcon. This New Zuari Bridge has eight lanes (4+4). It has dual carriageways of 27 m each and has a center median of 10.7m. It is the 2nd longest and widest cable-stay bridge in India. This bridge will be used as an expressway between Panaji and Margao, over the Zuari river. The main bridge over the Zuari river is 640m long. And the approach roads for this bridge cover over 13 km, starting from near the Bambolim cross in North Goa to near Birla cross in South Goa. It is a few meters downstream of the existing Zuari Bridge. The beauty of the bridge’s construction has been widely appreciated.[6]

It is expected that two towers[7] (110 m high from water level) will be built on this bridge. It is also expected that there will be an observatory and viewing gallery, an art gallery, and also a revolving restaurant.

Zuari Bridge Project – Information & Status


13.635 km Zuari Bridge project (NH-66) by NHAI in Goa is an under construction 6-8 lane access-controlled highway with a route alignment connecting Bambolim and Verna.

The project’s foundation stone was laid in January 2016. It has a current deadline of 2023. The bridge is slated to open in January 2023.

The project comprises of 3 sections – a 8.2 km highway from GMC Bambolim to Goa Velha, a new 1.08 km Zuari Bridge (Cortalim – Tiswadi) and a 3.6 km highway to Verna. Approximately 6.4 km of these highways will be elevated.

The new Zuari cable-stayed bridge is under construction by Dilip Buildcon and will be 640m long with a central span of 360m and end-spans of 140m on either side – making it the 2nd longest cable stayed bridge in India. The bridge will consist of 27m wide dual carriageways and a centre median of 10.7m. Its deck will comprise of a composite structure (steel structure and concrete).

Total Estimated Cost: Rs. 2701 crore

Project’s Total Length: 13.635 km (approx.)

New Zuari Bridge’s Length: 640m

Lanes: 6-8

Status: Under Construction

Deadline: 2023

Owner: National Highways Authority of India (NHAI)

Project Model: Engineering, Procurement and Construction (EPC)

Two tourist view towers worth Rs. 130 crore have been planned for construction in the future. It will comprise of an observatory & viewing gallery, revolving restaurant and art gallery



#cablestayedbridge
#civilpositive #goaindia #highwayride #cable #signature

show more

Share/Embed