How to change new roll film for the lanes packing machine?
Nicole Nicole Nicole Nicole
196 subscribers
2,035 views
16

 Published On Jun 10, 2022

How to change new roll film for the lanes packing machine?
1. Make this part(the side of the machine) low to bottom(This place, quick flash inside the video, only stayed for a second)
2. Screw the 2 black screws, to make it tight, so that can press the roll film, let the roll not move.
3. Cut the original roll
4. Press the roll film axis core button, to let the gas out. The roll film can be moved out from the axis.
5. Open the lock catch, to let the original roll film move out from the axis.
6. Put the new roll film on the axis(to the position of the mark part on the axis),
7. Close the lock catch, press two times of the axis core button, the roll can not move on the axis.
8. Put the roll head part, at the place where video show
9. Screw the bottom 2 black screws, lock the new roll film, let it not move.
10. Cut the superfluous new roll film
11. Connect the new roll film with the original roll film by tape
12. Loose the 4 black screws, to let the roll film can move smoothly, if make it tight, the roll film will be tensile failure
13. Operate the machine working without powder inside, to let the original film part use out, then packing powder by the new film

If want to know more, please contact [email protected] Whatsapp: 0086 18852471193

show more

Share/Embed