Introduction to BOP and BOE in Teamcenter MPP - PLM Nordic
PLM Nordic PLM Nordic
1.05K subscribers
4,390 views
39

 Published On Jul 26, 2023

BOP- Bill Of Process

A process structure describes how an assembly or part is manufactured. Processes are structured in hierarchical parent-child relationships. Sequence relationships can also exist between child processes.

BOE- Bill Of Equipment (WorkArea)

A plant structure is a hierarchy of work areas, as illustrated in the Sample plant structure. The work areas describe the locations existing in a plant in which manufacturing operations are performed. The hierarchy of the work areas can be very different from one plant to another.

The plant structure can represent the entire plant.

The plant structure can also represent work areas, sections, line cells, or stations within the plant.

Each work area can include resources that are permanently positioned at the work area.

Individual process operations used to manufacture a product are assigned to the work areas in which they are performed.

Each work area is typically configured with standard equipment but also can be specially configured with any equipment necessary to execute a specific operation.

If special resources are needed, create work instructions that explain how to configure the work area to meet an operation's special needs. If appropriate, create a workflow process to release the work instructions.

To know more visit here https://www.plmnordic.com/teamcenter-...
#BOP #BOE #MPP #teamcenter #manufacturing #plmnordic