Published On Dec 1, 2017
The Malaysia 1st Automated Light Rail Transit System operated since 1998. It has 5 different type of fleet which is:
Bombardier Innovia ART 200:
2-Coach Original
2-Coach Mid-Life Refurbish
4-Coach Original
4-Coach Mid-Life Refurbish
Bombardier Innovia Metro 300:
4-Coach Original.
This line consist over 80 set of trains.
00:00 KJ24 Kelana Jaya
00:00 KJ25 Lembah Subang
00:00 KJ26 Ara Damansara
00:00 KJ27 Glenmarie
00:00 KJ28 Subang Jaya
00:00 KJ29 SS15
00:00 KJ30 SS18
00:00 KJ31 USJ7
00:00 KJ32 Taipan
00:00 KJ33 Wawasan
00:00 KJ34 USJ21
00:00 KJ35 Alam Megah
00:00 KJ36 Subang Alam
00:00 KJ37 Putra Heights
show more