In todays video, i bring to you the finishing of our Local Kitchen Cabinet that was constructed in Feb 2024, todays marks the final day of completing the finishing.
COST 1 (ONLY Cabinet):
Structure : 700 GHS
Cabinet Desk Tiles : 1,430 GHS
Cement : 4 Bags : 348 GHS
Transportation (Tiles) : 300 GHS
Workmanship : 700 GHS
GROSS TOTAL (Only Cabinet) : 3,478 GHS
COST 2 (ONLY KITCHEN WALL)
Kitchen Wall Tiles (36m2): 4,406 GHS
Workmanship (40GHS Per M2) : 1,440 GHS
GROSS TOTAL : 5,846 GHS
Tiler :
Mr. Simon (0242741598 , 0536810745)
Thank you for watching.