Weighing and loadout of Processing Platform's Topside - The largest and heaviest module.
Mammoet Mammoet
44.2K subscribers
22,122 views
358

 Published On Apr 18, 2021

Video showcases weighing and load-out of the largest and heaviest module, for the construction of the Johan Sverdrup oil field in Norway. This module was firstly weighed using load cells on top of skid shoes. It was then moved at a distance of 55m before it was jacked up and set down. All mooring for the load-out was designed by Mammoet.

The Mammoet team worked closely with the customer and site contractors throughout the project. All work was completed at Geoje Shipyard in South Korea.

For more information about Mammoet, please visit https://www.mammoet.com

#movedbymammoet #amazingengineering #engineering