Mini Dumper Disaster! 😱 | Single Storey Extension #6
Build With A&E Build With A&E
95.4K subscribers
39,345 views
853

 Published On Jun 11, 2021

We're proud to be sponsored by James Hardie, the global leaders in manufacturing fibre cement products. Be sure to check out their exciting range of products here: https://bit.ly/3kpdtRd

Will continues with rebar fixing to key footings together. John gets to work with the power tools using a demolition hammer to finish off digging footings before the final concrete pour. The laser level is set up to check the concrete footings are poured to the right depth and we are ready to go. The concrete arrives and passes through the concrete pouring pump into the footings, John uses the concrete vibrating poker to disperse any air bubbles during the process. The next job is to clear the ground of excess material so John on the Yanmar ViO17 and Will and Joe on the Cormidi C85 dumper set to work. They discover a hole in the old soil pipe so John demonstrates how to fit a temporary waste pipe. Joe is back on the hammer breaker, breaking concrete from the old footings. Next job up is to mark out soakaway making sure it is at least 5m away from the building. Then disaster strikes as a detached mini dumper track brings proceedings to a halt! Pete comes to the rescue to reattach the mini dumper track ignoring instructions and doing it his way!!

PLEASE NOTE: we’ll endeavour to answer questions and comments as soon as possible depending on our work schedules.
_________________________________

For all our socials! ▶https://linktr.ee/buildwith_ae

Music from Epidemic Sound and the YouTube Audio Library
_________________________________

#ExtensionBuild #MiniDumper #Construction

Mini Dumper Disaster! 😱 | Single Storey Extension #6

show more

Share/Embed