Ito Na Ba Ang Sagot Sa Mga Pagbaha Sa Cavite?
JOHN REPS JOHN REPS
202K subscribers
14,724 views
337

 Published On Sep 17, 2021

The construction of the Imus retarding basin has a detention pond area of about 35 hectares while Bacoor retarding basin has two temporary storage pond or basin connected by sluiceway for a total area of 9 hectares to contain floodwaters during a storm and reduce the peak volume of flood flow in Imus River and Bacoor River.

#buildbuildbuildproject
#jica
#retardingbasin

show more

Share/Embed