Foundation work begins on HS2’s carbon-saving Wendover Dean Viaduct
HS2 Ltd HS2 Ltd
30.9K subscribers
13,781 views
291

 Published On Jul 7, 2022

Work has begun on HS2's pioneering low-carbon Wendover Dean Viaduct, with an expert team of ground engineers sinking the first of almost 63 concrete piles that will form the foundations.

Located south of the village of Wendover in Buckinghamshire, the 450m-long viaduct will be the first major railway bridge in the UK to be built with a ‘double composite’ structure, using significantly less carbon-intensive concrete and steel in comparison to a more traditional design.

Over the summer, engineers working for HS2 Ltd’s main works contractor, EKFB - a team made up of Eiffage, Kier, Ferrovial Construction and BAM Nuttall – will construct 63 concrete piles to form the foundations for the structure.

On top of each group of piles – which will range from between 38 and 46m deep - a concrete pile cap will support the pier which will in turn support the weight of the bridge structure above. Instead of hammering the piles into the ground, holes will be bored before being backfilled to create the pile.

The piers – some of which will be up to 14 metres high – will be cast as shells before being assembled on site and filled with concrete. This approach will reduce the amount of work on site and cut disruption for local residents. The first ‘double composite’ beams will be installed next year.

Find out more at:

Follow us on social media:
Twitter:   / hs2ltd  
Instagram:   / hs2ltd  
Facebook:   / hs2ltd  
LinkedIn:   / high-speed-two-hs2-ltd  

#HS2 #engineering

If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected].

show more

Share/Embed