HO Tehachapi Loop Cab Ride East
Ron Ciminero Ron Ciminero
498 subscribers
67,043 views
417

 Published On Oct 27, 2016

Enjoy the cab view sights and sounds of BNSF and UP trains on my partly complete HO Tehachapi Loop layout. A present day DCC operation with tunnels, bridges, paved roads, structures, operating signals, operating crossing gates and a maximum grade of 2.2 %.

Share this video:
   • HO Tehachapi Loop Cab Ride East  

Layout construction photos:
https://goo.gl/photos/8oAC4e8mcXXPnnrv8

Crossing gate construction photos:
https://goo.gl/photos/Jz1ovwhuDYc7TceS9

Signaling operation photos:
https://goo.gl/photos/PoUc831YaMKXMD4z9

Video:
Hardware: GoPro Hero 3+
https://gopro.com/

Software: OpenShot Video Editor
http://www.openshot.org/

Kubuntu 16.04 LTS OS
http://www.kubuntu.org/
Layout:
Electronics
DCC: Digitrax
http://www.digitrax.com/

IR sensors: Azatrax (crossing gates)
http://www.azatrax.com/

Computer: Arduino UNO (crossing gates)
http://www.arduino.org/

Arduino Shields: Adafruit (crossing gate - motor, proto)
https://www.adafruit.com/

Hardware
Track: Code 83 mainline
Turnouts: Peco
http://www.peco-uk.com/

Turnout motors: Tortoise
http://www.circuitron.com/index_files...


Signals: Tomar
https://tomarindustries.com/signals.htm

Crossing gates: NJ International
http://www.njinternational.com/

Software:
Display and signal: JMRI
http://www.jmri.org/

Linux Mint 17.3 OS
https://www.linuxmint.com/

Locomotives:
MTH
http://mthtrains.com/

Intermoutain
http://www.intermountain-railway.com/

show more

Share/Embed