Mumbai Metro Line 3 AQUA Explained for Mumbaikars || ROUTE || FARE || TIMINGS ||
PowerTrain PowerTrain
572K subscribers
79,883 views
1.6K

 Published On Oct 5, 2024

#mumbai #Metro3 #mumbaimetro

The phase one of Mumbai's first underground Metro Aqua Line 3 between Aarey and BKC, has opened on October 5th 2024

The Line 3 of the Mumbai Metro, also known as Colaba-Bandra-Seepz Line, is a part of the metro system under construction (as of 2021) in Mumbai, India. When completed, the 33.5 km long line will be the first underground metro line in Mumbai and will be operated by MMRC. The metro line will connect Cuffe Parade business district in the extreme south of the city to SEEPZ in the north-central with 26 underground and one at-grade station. The tunnel alignment will consist of twin tunnels 5.5 m in diameter each, at a depth of 20-25 m below ground. Seventeen tunnel boring machines are being used, to construct these tunnels.


CHANNEL

00:00 Purpose
01:08 How much of Line 3 is Opening Route
01:29 Route Explained
01:53 Tickets options
02:39 Stations on route
03:13 Details about Airport Terminal 2 Station
04:38 Marol Naka Interchange Station
05:16 Pricing
05:33 Timing
05:46 Frequeny of trains
05:55 Features in the train
06:07 Last Mile Connectivity
06:28 Line 7 and bullet train connection
07:22 What Region mumbikers can benefit



🔔 Join this channel to get access to perks:
   / @powertrain  

OUR OTHER CHANNELS

⚪VLOG CHANNEL -    / @aakashbhavsar2342  
⚪FOOTAGE DEMOCRACY -    / @footagedemocracy3663  
⚪SHORTS CHANNEL -    / @powershorts1068  


FOLLOW US ON
⚪INSTAGRAM 1 -   / aakash_rb  
⚪INSTAGRAM 2-   / powertrain_yt  
⚪FACEBOOK -   / powertrainofficial  
⚪TWITTER -   / powertrain_yt  

⚪DISCORD -   / discord  



_____________________________________________________________________

INTRO MUSIC IF PRESENT - LEMMiNO - A THOUSAND YEARS
   • LEMMiNO - A Thousand Words  
CC BY-SA 4.0

show more

Share/Embed