How To Build Hydroelectric Plant On High Mountain. Pelton Turbine & Generator Manufacturing Process
YouCanDo TV YouCanDo TV
170K subscribers
1,344,696 views
6K

 Published On Apr 15, 2023

How To Build Hydroelectric Plant On High Mountain. Francis Turbine & Generator Manufacturing Process
0:22. Seamless Rolled Ring
1:59. The Manufacturing of a Francis Turbine Stay Ring
3:36. The production of a Francis runner
5:28. The fabrication and assembly of a Francis runner
9:45. Production of generators
15:59. Production of Pelton runners
18:59. Hydraulic steel construction
21:52. The dam wall construction process
25:08. The Limmern pumped storage plant
29:26. Vernayaz Hydroelectric Power Plant
---------------------------------
⚠️ Copyright Disclaimers
• We use images and content by the YouTube Fair Use copyright guidelines
• Section 107 of the U.S. Copyright Act states: “Notwithstanding the provisions of sections 106 and 106A, the fair use of a copyrighted work, including such use by reproduction in copies or phonorecords or by any other means specified by that section, for purposes such as criticism, comment, news reporting, teaching (including multiple copies for classroom use), scholarship, or research, is not an infringement of copyright.”
• This video could contain certain copyrighted video clips, pictures, or photographs that were not specifically authorized to be used by the copyright holder(s), but which we believe in good faith are protected by federal law and the fair use doctrine for one or more of the reasons noted above.

show more

Share/Embed