SmartVac Hydrovac Excavation Video
SmartVac Hydrovacs SmartVac Hydrovacs
296 subscribers
86,217 views
313

 Published On Jul 4, 2016

Watch as the SmartVac Hydrovac sets up at the job site in 3 minutes, and then proceeds to dig a 4ft x 4ft x 5ft hole in just 18 minutes. The SmartVac can dig 2 holes this size before running out of water or requiring to dump.

For more information please visit us online at:
www.smartvac.ca

or contact a member of our sales team at:
403-786-9966
[email protected]

show more

Share/Embed