Wednesday, October 1st, 2014:
This video clip originally was to feature the TTC's new Nova articulated buses (and other buses caught after dark).
But thanks to emergency repairs needed to a tunnel lining that was pierced by a Metrolinx contractor working on the Union-Pearson line station at Bloor causing silt and mud to foul the tracks of the Bloor-Danforth subway line, the TTC shut down service on that line between Keele and Ossington stations at 10pm on the night this video was made. Buses filled the gap, and so we get shuttle bus action at Bloor & Dufferin. Anything that could be pulled for service was out on the street for the duration.
The shuttle bus sequences were shot between 10:15 and 10:45pm.