Published On Feb 16, 2018
The gravel layer in a USGA putting green allows the rapid movement of excess water out of the rootzone mix and into the drainage pipes. The gravel layer must be installed to a minimum depth of 4 inches, but the depth can vary above that to create the desired contours. The final surface of the gravel layer must conform to the proposed finished grade of the putting green.
show more